Featured Commercial Construction Projects

Picture of Curtin University Job Finished

Curtin University-WA

Client- Curtin University

Location- Bentley, WA

Project description

6 story university building for Curtin University

Scope of work

OSB played a crucial role in the development of Curtin University, showcasing expertise in comprehensive earthworks and intricate concrete installations. Our team's proficiency ensured the successful completion of key structural components, contributing to the functionality and aesthetics of this esteemed educational institution.

Scope of Works:

  • Conducted detailed earthworks, meticulously preparing the site for construction activities and ensuring optimal conditions for subsequent phases of the project.

  • Installed concrete pads for precast elements, employing precision techniques to facilitate the seamless integration of precast structures into the overall construction.

  • Constructed the center core structure, utilizing advanced construction methods to achieve structural integrity and stability for the building's core elements.

  • Placed all concrete for suspended slabs, including various slab types such as conventional and precast slabs, demonstrating versatility and adaptability in construction methodologies.

  • Collaborated closely with project stakeholders to ensure alignment with design specifications and project requirements, facilitating efficient construction processes and timely completion.

  • Upheld stringent safety standards throughout the project, prioritizing the well-being of workers and site personnel while minimizing disruptions to ongoing activities.

  • Delivered the scope of work within designated timelines and budget parameters, contributing to the successful realization of Curtin University's infrastructure enhancements and the advancement of its educational mission.

Picture of Element 27 Residential Building Finished

Element 27

Client- Puresilver Corporations Ltd.

Location- Subiaco, WA

Project description

OSB played a pivotal role in the construction of Element 27, a 93-unit multi-residential complex situated in Subiaco's former light industrial zone. OSB's expertise in bulk earthworks and reinforced concrete was instrumental in laying the foundation for this transformative redevelopment project.

Scope of Works:

  • OSB conducted extensive bulk earthworks to prepare the site for construction activities, ensuring optimal conditions for the development of the multi-residential complex.

  • OSB executed reinforced concrete construction for the entire structure, including five storeys above ground and two basement levels of car parking and storage, providing the necessary support and stability for the building.

  • OSB collaborated closely with architects, engineers, and other contractors to ensure seamless integration of concrete works with the overall construction of the complex.

  • OSB upheld stringent safety protocols throughout the project, prioritizing the well-being of workers and site personnel while minimizing disruptions to ongoing activities.

  • OSB delivered the scope of work within designated timelines and budget constraints, contributing to the successful completion of Element 27 as a modern and vibrant addition to Subiaco's urban landscape.

Picture of finished Joondalup Carpark Job

Joondalup Car Park

Client- City of Joondalup

Location- Joondalup, WA

OSB played a pivotal role in the development of the Joondalup Car Park, undertaking various construction tasks including the construction of pads, footings, in-situ columns, slab on ground, suspended slabs, and drop beams. Additionally, OSB successfully installed over 206 precast panels to ensure efficient completion of the project.

Scope of Works:

  1. Construction of Pads and Footings: Conducted precise and detailed construction of pads and footings to provide stable support for the car park structure, ensuring longevity and durability.

  2. Construction of In-situ Columns: Executed the construction of in-situ columns with meticulous attention to detail, employing advanced techniques to achieve structural integrity and stability.

  3. Slab on Ground and Suspended Slabs: Implemented the construction of slab on ground and suspended slabs, utilizing precision methods to meet structural requirements and accommodate vehicular loads.

  4. Installation of Drop Beams: Successfully installed drop beams to enhance the structural stability and load-bearing capacity of the car park, ensuring safety and longevity.

  5. Installation of Precast Panels: Installed over 206 precast panels with efficiency and precision, contributing to the timely completion of the project and minimizing construction time on-site.

  6. Collaboration and Safety: Collaborated closely with all stakeholders involved in the project, including architects, engineers, and contractors, to ensure seamless integration of all components and adherence to design specifications. Upheld stringent safety protocols throughout the construction process to prioritize the well-being of workers and site personnel.

  7. Timely Delivery: Delivered the scope of work within designated timelines and budget constraints, contributing to the successful completion of the Joondalup Car Park project as a crucial infrastructure asset for the community.